Oled Operating Instructions - Inter-m DSA-500Q Operation Manual

Professional power amplifier
Table of Contents

Advertisement

OLED Operating Instructions

OLED Operating Instructions
1. Initial screen when you turn the power ON
INTER-M
Network Initialize
■■■■■■■■■■■
This initial screen appears when the power cable is connected to the set and the DsP begins to boot up. If
indicates that the device is currently booting up. Boot-time is approximately 10 seconds.
2. Switch OFF screen once booting is complete.
STAND BY
AMP OFF
This screen indicates that the power cable has been connected and the power switch remains off, but the
device has completed its boot-up protocol. If you turn the switch on when the system is displaying this
screen, power will be supplied and the oleD control screen will appear.
3. Initial OLED Control Screen
LOCK OFF
DSP [ IN
CH1
CH2
CH3
CH4
IP : 192. 168.
PC OFF
<->
OUT ]
0d
0d
0dB
0d
0d
0dB
0d
0d
0dB
0d
0d
0dB
1. 99
(S)
ProfessIonAl PoWer AMPlIfIer
DsA-500Q/2000Q
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsa-2000q

Table of Contents