Program - Mitsubishi Electric MELSEC iQ-R Series Reference Manual

Inter-module synchronization function
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Program

The master station CPU module instructs the local station system output, and with this instruction, the master station system
output and local station system output are performed at the same inter-module synchronization cycle timing. It takes two inter-
module synchronization cycles from when the master station CPU module instructs the local station CPU module until output
is performed from the local station system. Thus, to perform output from a module nearest the master station, start it using the
inter-module synchronization function FB after two inter-module synchronization cycles. ( MELSEC iQ-R CPU Module
Function Block Reference) When the CC-Link IE Field Network synchronous communication stops due to disconnection of
the local station, reset the local station from the master station using the remote reset FB after the local station is returned.
( MELSEC iQ-R Ethernet/CC-Link IE Function Block Reference)
7
7 PROGRAM EXAMPLES
43
7.2 For Network Configuration

Advertisement

Table of Contents
loading

Table of Contents