Software section
3.5 Team engineering via Inter Project Engineering
6. Create a bar graph for the other fill levels in the same way.
7. Compile the project.
Result
The project can now be loaded to the HMI device from the commissioning engineer. The
communication with the CPU is up-to-date thanks to the CPU data from the IPE file.
116
Getting Started, 05/2014, A5E03981761-AC
S7-1500