Installing
4.1 Mounting positions
4.1
Mounting positions
Permitted mounting positions
The PPU is secured with special tensioning elements and tensioners in the operator panel
housing. The tensioners are included in the scope of delivery.
Note
Installing the PPU
The maximum permissible tightening torque for the tensioning screws is 0.5 Nm and this value
must not be exceeded.
Installation of the horizontal PPU variant
①
Figure 4-1
44
Mounting frame
Clearance for ventilation and cables in the horizontal PPU
PPU and components
Manual, 05/2015, 6FC5397-2DP40-3BA4