cOMMISSIONING
7.0

7.5 cOMPLETION

a)
Instruct the user in the operation of the boiler and the system including
the integral central heating programmer and the room thermostat. The
explanation should include the sequence of operation.
b) The central heating flow temperature and the domestic hot water outlet
temperature are factory set. These should not normally require any
adjustments. However if in exceptional circumstances this is necessary
then this can be done following procedures outlined in section 10 of this
document.
c)
Carefully read and complete all sections of the Benchmark Commissioning
Checklist at the rear of this publication that are relevant to this appliance
and the installation. These details are required in the event of any warranty
work. The publication MUST be handed to the user for safe keeping and
each subsequent regular service visits should be recorded. In addition
for IE it is necessary to complete a 'Declaration of Conformity' to indicate
compliance to I.S.813 and an example of this is given in the current edition
of I.S.813.
d) Hand over the 'Users Operating, Installation and Servicing Instructions'
giving advice on the necessity of regular service.