Commissioning; Preconditions - Siemens OpenAir G..B181.1E/KN Series Technical Basics

Vav compact controller knx/pl-link
Table of Contents

Advertisement

Commissioning

requirements
Operating mode and
display
Siemens
Building Technologies
6.3
Commissioning
6.3.1

Preconditions

Type and number of parameters that can be set may vary. Prior to commissioning,
all VAV compact controllers must be mounted according to the mounting instruction
M3547 as well as all other devices as per the corresponding mounting instructions.
All devices must be connected to the power supply and bus cabling. Power supply
and bus cabling must be tested.
For KNX installations with multiple lines, it is recommended to do the
commissioning line by line.
After power-up, the device can assume the following states:
State / intended
behavior
Functionality available in all system environments
Power-up / device
starts up
Faultless operation
Set device to
programming /
addressing mode
Reset device to
factory settings
Additional functionality available in PL-Link environments only
Execute connection
test
Acknowledge
connection test
VAV compact controller KNX/PL-Link G..B181.1E/KN
User action
Device response (LED)
Connect device to
LED is orange / goes off after power-
power supply
up is completed
none
LED is off
Short key press
LED is red (no time limit)
(<0.5 s)
Long key press
LED flashes orange until reset is
(>20 s)
completed
Middle key press
LED flashes orange
(>2 s and <20 s)
Then (each for 60 seconds or prior
cancellation by key press):
a) LED is green ⇓ connection test
b) LED flashes red (1s – interval) ⇓
Short key press
LED is off
(<0.5 s)
successful
connection test failed
CE1P3547en