Download Print this page

Daikin FTE09JV2S Service Manual page 12

Removal procedure 9000/12000 btu/h class

Advertisement

Removal of Electrical Box / PCB / Swing Motor
Step
2. Remove the printed circuit
board (PCB).
1
Remove the shield
plate.
2
To remove the front
cover of the electrical
box, disengage the
knobs by pushing the 2
hooks at the top and the
bottom.
Slide the front cover of
3
the electrical box to the
left and remove it.
10
Procedure
(R10736)
Pushing point
Front
cover
Shield plate
Pushing point
(R10739)
Si04-960
Points
(R10737)
Push
(R10738)
Removal Procedure

Advertisement

loading

This manual is also suitable for:

Ftxs09hvjuFtxs12hvjuFte12jv2s