Select When The Sampling Program Starts - Hach AS950 Operation Manual

Table of Contents

Advertisement

7. Set the options as follows.
Option
Delay Type
Date
Time
8. Go directly to
Select when the program stops

Select when the sampling program starts

Select when the sampling program starts after the RUN/HALT button is pushed.
1. Push MENU.
2. Go to Programming>Sample Programming>Program Start.
3. Select an option.
Option
Immediately on
'Run'
On Trigger
After Delay
On Schedule
Type
Description
None
The sampling program starts after no delay.
Data and Time
The sampling program starts after a set date and time.
Time Duration
The sampling program starts after a set amount of time.
Flow Duration
The sampling program starts after a set flow volume occurs. Select the source of the flow
measurement.
AUX-Pulse (or AUX-mA)—An external flow meter or third-party device connected to the
AUX I/O port. Flow 1 (or 2)—A sensor connected to the Sensor 1 (or 2) port. IO 1 (or IO 2)
—Analog Input IO 1 (or IO 2) of the optional IO9000 module.
Note: A flow measurement that is supplied through a sensor port or the IO9000 module is only available for
selection after it is selected to be recorded to the data log.
4
Slave, Sequential
The sampling program starts after the sampling program of the leading sampler is complete.
4
Slave, Parallel
The sampling program operates only when the sampling program of the leading sampler
operates.
4
This option is only applicable when two sampling programs are used. If a slave delay setting is
not selected, the two sampling programs operate independently.
Set to:
Date and Time
Enter the start date for the sampling program.
Enter the start time for the sampling program.
Description
The sampling program starts when RUN/HALT is pushed.
The sampling program starts (or starts and stops) when a trigger occurs. The trigger is a
selected channel alarm or a signal from an external flow meter or third-party device that
is connected to the AUX I/O port. Refer to
on page 20.
When RUN/HALT is pushed, the sampling program starts after the selected delay.
Refer to
Table 11
for the delay options.
The sampling program starts on the selected day(s) of the week and time(s). Select a
maximum of 12 schedule intervals.
Delay—Sets the sampling program to start on the first scheduled day and time after a
selected delay. The delay is one time only. Refer to
Schedule Intervals—Sets the number of schedule intervals (1 to 12). Edit Schedule—
Sets the start day and time and the stop day and time for each schedule interval.
Table 11 Delay options
on page 20.
Start the program on a trigger (optional)
Table 11
for the delay options.
English 19