Download Print this page

Aerial Assault Wakeboard Tower Installation Manual page 10

Advertisement

STEP 11
STEP 12
STEP 13
10
The lower section of the switch blade can now be assembled to the
lower fittings and clamp using the trim washer, M12 X 45mm socket
head cap bolt and threaded lap joint.
Insert the front leg hinge joint into the lower section of the front arm
(repeat for the other side). Its important not to completely tighten
the fittings as some adjustment will necessary before the installation is
complete.
Before inserting the top-section, make sure there are no burrs in the
top-section. Someone will need to hold the top-section for you as you
insert the front arm into the top-section and fit the hinge into the side
rail.
*** IMPORTANT NOTES ***
- Lubricate telescopic parts with a light grease before sliding together.
- Grease will not prevent the smaller diameter tube from being
scratched by the top section tube during insertion so be very care-
ful not insert the side section tube any further than the final installation
width.
Once the sides and top section are assembled the fittings that con-
nect to the ends of the front legs can now be firmly tightened so that
they do not rotate.
The rear switch blades can now be installed by attaching the top switch
blade fitting to the fitting located on the upper section of the front leg. The
clamp located on the base of the switch blade will be connected to the
lower side rail. We recommend making sure that the clamps on both sides
of the tower are located the same distance from the end of the side rail so
that your tower looks symmetrical.
During the clamp installation, don't forget to install the rubber clamp col-
lar's between the clamp and the lower side rail. These will be required to
allow the clamps to firmly fasten in place.
GUIDE#: pwb-ASSAULT-004

Advertisement

loading