Mounting The Finishing Kits - Toro Reelmaster 5010-H Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 5010-H:
Table of Contents

Advertisement

1. Reel-drive motor
4

Mounting the Finishing Kits

Parts needed for this procedure:
1
Finishing kit
Procedure
Important:
To ensure that the hose routing is
appropriate and the hoses are not twisted, mount
the motors to the cutting units before mounting
the finishing kits.
1.
On the front left corner of the frame (no. 4
cutting unit location), remove the extra flange
nut on the bolt securing the bulkhead bracket to
the machine
(Figure
2.
Loosen the nuts on the finishing kit hose fitting,
insert the hose into the slot on the bulkhead
bracket and tighten the nuts.
Figure 11
2. Mounting bolt (2)
12).
Note:
When tightening the nuts, use a back
up wrench to prevent the hose from twisting or
kinking.
3.
Insert the connector plate onto the
bulkhead-mounting bolts with the connectors
positioned as shown in
4.
Secure the connector plate to 1 of the mounting
bolts with the flange nut previously removed.
5.
Locate the wire harness on the machine and
plug the wire connectors into the wire connectors
of the finishing kit.
g027140
No. 4 Cutting Unit Location, Left Front
1. Extra flange nut
2. Connector plate
6.
Repeat the procedure on the remaining 4
bulkhead locations as shown in
through
Figure
Important:
positioned differently at the remaining
locations so the hose can be routed through
the bulkhead bracket and to the cutting unit
without getting twisted or kinked.
13
Figure
12.
Figure 12
3. Bulkhead bracket
Figure 13
16.
The connector plates are
g027210

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents