Picture 5-17 Flight Case
Chapter 6 VMR-I Installation Process
This chapter mainly introduces the installation process of the VMR-I HD series
products and guides the customer to install the products correctly. The VMR-I HD
series products generally adopt two installation methods: stacking and hangig, which
are described in detail in this chapter.

6.1 Place Installation

In the case of frequent replacement of the screen use location, the installation method
of the seat is usually adopted. The company provides customers with a new floor
stand that can be quickly installed. The following is the step of quick installation of the
new floor stand.

6.1.1 Preparatory Work

1. Select the installation area of the VMR-I HD display and enclose it with a safety
warning band. Non-workers are not allowed to enter without permission, keeping the
installation area clean, free from dirt and debris.
2. Ensure that you have read, understood and followed all of the safety issues
mentioned in Chapter 1 before installation;
3. Make sure that the installed LED cabinets, accessories, tools and other materials
are ready in place.

6.1.2 Folding bracket installation instruction