6.2

Connecting to the circuit

This chapter describes options for connecting the 3KC0 transfer switching equipment to the
circuit.
NOTICE
System damage!
System damage is possible if the equipment is not installed properly.
• Connect the two power supply systems with phase equality.
• Tighten all terminals on sizes 1 and 2.
6.2.1

Load connection

The load can be connected in any way with the 3KC0 transfer switching equipment: The load
can be connected at either the top or the bottom of the device.
6.2.2

Arrangement of the power supply systems

Sources I or II can be connected with the 3KC0 transfer switching equipment. No distinction
is made between prioritized sources.
The same applies to the connection of the generator and the main source.
3KC0 manual transfer switching equipment
Manual, 09/2018, L1V30368969105-01
Connection
6.2 Connecting to the circuit
37