Mounting Completion - 2N Access Unit Installation Manual

Hide thumbs Also See for Access Unit:
Table of Contents

Advertisement

2.5 Mounting Completion

Mounting Completion
Check the connection of all wires and the RJ-45 plug to the pigtail (adapter)
connected to the motherboard.
Caution
Make sure that the terminals of all the unused connectors are tightened
properly to avoid sound vibrations.
Frame Mounting
Check the frame sealing before fitting the frame.
Version A
Screw the flush mounting frame in the upper and bottom parts.
Version B
Hang the wall mounting frame on the hook in the upper part and then screw it tight in
the bottom part.
Caution
Improper mounting may deteriorate the
Water infiltration may damage the electronic part.
Make sure that all the holes are filled with some waterproof material –
the top part, around the cables and the screws.
Use silicone or some other sealant to seal the box against the wall if
uneven to avoid water leakage and wall damping.
2N TELEKOMUNIKACE a.s., www.2n.cz
2N Access Unit
waterproofness.
103/116

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents