Safe start-up and operation

These warnings are for all personnel who commission, plan the operation or operate the
inverter.
WARNING! Obey these instructions to prevent injury or death, or damage to the
equipment.
Keep the door of the inverter locked when it operates. Give the keys only to authorized
personnel.
Before you start the inverter, close the main AC breaker or main AC switch
disconnector +AC-Q2 and DC switch disconnector +DC-Q1, auxiliary power supply
+AC-F30 or external auxiliary power supply.
When the inverter operates, do not open the AC or DC main switches.
Before you adjust the inverter and put it into service, make sure that all of the
equipment is suitable for operation.
The maximum allowed number of power-ups by applying power is five in ten minutes.
Do not use the inverter in a manner not specified in this manual.
Do not stay close to the inverter while the inverter is starting up or in running state. Adjust
the start-up delay in a way that you have sufficient time to vacate the inverter room.
Safety instructions 15