6.1.2 Dry-Installed - ABS XFP series Installation, Operating And Maintenance Instructions

Submersible sewage pump
Table of Contents

Advertisement

6.1.2 Dry-installed

Horizontal
10
10
9
9
8
8
7
7
Vertical
10
10
9
9
8
8
7
7
1
Control panel
2
Discharge line
3
Gate valve
ATTENTION!
PE3 pumps must not be dry-installed without a cooling jacket.
Under continuous running conditions the pump motor housing may become hot.
To avoid burn injury allow to cool down before handling.
Installation, Operating and Maintenance Instructions (Original Instructions)
4
Non-return valve
5
Power cable from motor to
control panel
6
Pump
ABS submersible sewage pump XFP 80C - 201G
7
Collection sump
8
Infl ow line
9
Ball-type fl oat switch
10
Gate valve
9
1
1
2
2
3
3
4
4
5
5
6
6
1
1
2
2
3
3
4
4
5
5
6
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the XFP series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF