Mower Spindles (Field Serviceable Spindles) Bearing Replacement - Snapper OUT FRONT Z-RIDER ZF2100DKU Safety Instructions And Operator's Manual

Out front z-rider hydro drive series 0
Hide thumbs Also See for OUT FRONT Z-RIDER ZF2100DKU:
Table of Contents

Advertisement

Section 4 - ADJUSTMENTS
& REPAIR
4.8
MOWER
SPINDLES
(Field
Serviceable
Spindles) BEARING REPLACEMENT
In the
event
that
a spindle
bearing
requires
replacement,
the
SNAPPER
Field
Serviceable
Spindles have been designed so that no special
tools or presses are required.
1. Remove belt. Loosen blade nut and remove.
Allow blade bolt, washer, blade and four spacers to
drop down out of the spindle housing. See Figure
4.11.
REMOVE NUT
_
. REMOVE BELT
__<=( ROM SPINDLE
"--.- ;Oo O O
o, oo
FIGURE 4.11
2. Remove spindle pulley from spindle shaft.
3. Locate circular retaining ring on spindle shaft at
top bearing. Remove retaining ring. Allow spindle
shaft to drop out of housing.
4. Top and bottom bearings are now removable.
Pull out on inner
race to slide
bearing from
housing. See Figure 4.12.
BEARING
SEAL UP
qp.._ PULLEY
SPINDLE
_
HOUSING
i
n
INNER RACE ""_0
BEARING _
i ...............................
BEARING SEAL
DOWN
5. Thoroughly
clean all parts removing
all old
contaminated grease.
6. Install new bottom bearing first.
NOTE: The bearing is sealed/shielded
on one side
only. The bottom bearing must be installed with the
sealed/shielded side DOWN.
7. Insert
spindle
shaft
up through
the bottom
bearing. Slide spacer down over spindle shaft.
8. Install new top bearing. Install the top bearing
with the seal/shield UP.
9. Slide circular retaining ring down spindle shaft
until it fully locks into groove on shaft.
10. Place spindle
pulley and spacer on top of
spindle shaft.
11. Reinstall blade bolt, washer,
blade and four
spacers.
12. Torque blade bolt and nut to 60 to 75 ft. Ibs.
IMPORTANT:
Spindle
housing
must be filled
with grease before operating mower. Failure to
fill
housing
will
cause
premature
bearing
failure.
13. Pump grease into spindle housing until grease
purges from vent on housing.
14. After the first 5 hours of operation,
grease
spindle housing to insure it is full, then every 25
hours.
FIGURE 4.12
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf2300gkuZf5200mZf6100m

Table of Contents