GOLD version E/F, Function Guide,
SMART Link/AQUA Link
1. General
The SMART Link function is intended for use in controlling
the times, temperatures, etc. as well as reading the alarms
and settings of a Swegon chiller/heat pump via a hand-
held micro terminal and web page in a GOLD air handling
unit.
For electrical wiring and functionality at connection with
Nestor, see separate documentation.
1.1 Energy-saving functions
1.1.1 Control of the supply air temperature/supply
flow temperature
By comparing the supply air temperature downstream of
the fan with the supply flow temperature to the coil, the
equipment makes sure that the valve for the coil opens
only if the water has a temperature that conveys energy to
the air.
This means that if there is a heat load and the water tem-
perature is lower than the supply air temperature, which
can occur during defrosting cycles, the valve is not allowed
to open. If there is a cooling load, the reverse applies.
1.1.2 Optimisation function
A cooling unit/heat pump will be more effective if the dif-
ference between the outdoor temperature and the water
temperature is as small as possible. This reduces energy
consumption.
The supply air energy to a water coil is controlled by a
valve. Optimisation of the valve position so that it always
strives to be fully open, and instead control the water
temperature, saves energy.
1.1.3 AQUA Link
The AQUA Link provides both air handling units and
comfort modules with cooling power. Even here energy
savings are obtainable by allowing the need to control the
water temperature.
Depending on whatever the specific need is (dehumidifi-
cation, cooling of the supply air, cooling of the room via
comfort modules), the temperature of the chilled water
can be varied and the control system ensures that the
chiller will not produce chilled water that is colder than
necessary.
1.1 Installation
The installation work is fast and simple compared with
that of other systems. It requires only hydraulic and elec-
tric connection between the GOLD unit, chiller/heat pump
and possible AQUA Link.
All the necessary control functions are ready to activate.
One supplier of all the equipment.
The IQlogic
module TBIQ-3-1 is included in the AQUA
+
Link equipment cubical.
Swegon reserves the right to alter specifications.
2. Material Specification
Air handling unit
Cable adapter
IQlogic
module,
+
extra regulation sequence (SMART link)
Chiller/heat pump manufactured by Swegon that uses
glycolic water as cooling or heating media (not evapora-
tive media).
Other equipment to the extent required:
Set of valves, air heater, air cooler, dual-purpose coil,
AQUA Link.
GB.BlueBox.180415
GOLD RX/PX/CX/SD
TBLZ-1-64
TBIQ-3-2
www.swegon.com
1

Advertisement

loading

Summary of Contents for Swegon TBIQ-3-1

  • Page 1 The SMART Link function is intended for use in controlling Air handling unit GOLD RX/PX/CX/SD the times, temperatures, etc. as well as reading the alarms and settings of a Swegon chiller/heat pump via a hand- Cable adapter TBLZ-1-64 held micro terminal and web page in a GOLD air handling...
  • Page 2: Operation

    80%*, the controller increases the refriger- ant temperature setpoint at a rate of 0.6K/minute*. * Factory setting. The value can be changed. ** Estimated temperature in the GOLD RX. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 3 80%*, the controller decreases the refrig- erant temperature setpoint at a rate of 0.6K/minute*. * Factory setting. The value can be changed. ** Estimated temperature in the GOLD RX. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 4 BT30**, the * Factory setting. The value can be changed. function does not allow valve MF1 to regulate the flow ** Estimated temperature in the GOLD RX. (forces it to close). www.swegon.com Swegon reserves the right to alter specifications.
  • Page 5 80%*, the controller increases the refriger- ant temperature setpoint at a rate of 0.6K/minute*. * Factory setting. The value can be changed. ** Estimated temperature in the GOLD RX. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 6 80%*, the controller decreases the heating medium temperature setpoint at a rate of 0.6K/minute*. * Factory setting. The value can be changed. ** Estimated temperature in the GOLD RX. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 7 If the temperature by temperature sensor BT50 is higher than the temperature by temperature sensor BT30**, the function allows valve MF1 to regulate the flow. * Factory setting. The value can be changed. ** Estimated temperature in the GOLD RX. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 8 If the optimisation function is allowed and valve MF2 is open less than 80%*, the controller increases the refriger- ant temperature setpoint at a rate of 0.6K/minute*. * Factory setting. The value can be changed. www.swegon.com Swegon reserves the right to alter specifications.
  • Page 9: Electrical Connections

    The cables are not included in the supply. Twisted-pair cables are recommended. 4.1.1 Alternative 1. Connection to the chiller's/heat pump's controller Cable adapter (TBLZ-64) pC05+ Wiring terminals for the TBLZ-64 cable adapter Wiring terminals, pC05+ chiller/heat pump www.swegon.com Swegon reserves the right to alter specifications.
  • Page 10 Communications interface (SMART Link) A4 (RS485) Wiring terminals for the Wiring terminals, SMART Link TBLZ-64 cable adapter communications interface 24 VAC Wiring terminals, junction box, chiller/heat pump Cable connected at the factory www.swegon.com Swegon reserves the right to alter specifications.
  • Page 11 Link communications interface A2 (mC Cable adapter (TBLZ-64) Communications interface (SMART Link) A4 (RS485) Wiring terminals for the TBLZ-64 cable adapter Wiring terminals, SMART Link communications interface Cable connected at the factory www.swegon.com Swegon reserves the right to alter specifications.
  • Page 12 GB.BlueBox.180415 4.1.4 Alternative 4. Connection via internal iPro-link communications interface Cable adapter (TBLZ-64) ASM1 (iPro-link) SERI1 (485/TTL) A2 (IC208CX) Wiring terminals for the cable adapter ASM1 SERI1 Cable connected at the factory www.swegon.com Swegon reserves the right to alter specifications.
  • Page 13 GB.BlueBox.180415 4.1.5 Alternative 5. Connection via external A2 com- munications interface (RS485 slave) Cable adapter (TBLZ-64) A2 (RS485 slave) Wiring terminals for the TBLZ-64 cable adapter 97 (-) 98 (+) 99 (GND) www.swegon.com Swegon reserves the right to alter specifications.
  • Page 14 105 106 107 108 109 110 -BTT IQlogic 102 103 G MX X1 G1 COM POWER The function selector switch Com 1 Com 2 must be set to position 5. Modular cable www.swegon.com Swegon reserves the right to alter specifications.
  • Page 15: Manual Test

    Manual test The actual input and output values on the circulation pump in the cooling circuit can be manually controlled under INSTALLATION – MANUAL TEST - SMART Link. Manual test SMART Link www.swegon.com Swegon reserves the right to alter specifi cations.