[d] OPTIONS

Strainer x 1
When ordering an optional part, ask an authorized Hoshizaki service company
for its installation.

3. CHECKS BEFORE OPERATION

[a] CHECKS AFTER INSTALLATION

* In the presence of the installer, check for proper installation according to "IV.
INSTALLATION".

[b] CHECKS BEFORE OPERATION

* Ambient temperature should be within 1 to 35°C and water temperature within 5 to 30°C.
Do not install the unit where there is a possibility of freezing. If the ambient temperature
exceeds 35°C, use a ventilator.
* Keep the Scoop in the Scoop Holder inside the Storage Bin.
1. Although the Storage Bin has been cleaned before shipment, clean it again
before use. See "III. MAINTENANCE".
2. When the unit is used for the first time or after more than a week, the Storage
Bin interior or ice may smell. This is not harmful and will fade away while the
unit is running. For sanitary reasons, discard the ice produced in the initial
freeze cycle.

[c] WATER SUPPLY AND DRAIN CONNECTIONS

* The connections differ for each installation site. Check the locations of the Water Supply
Line Shut-off Valve, Water Supply Valve and Drain Valve.

[d] AUTOMATIC ICEMAKING PROCESS

* When the Storage Bin is filled with ice and ice pushes the Bin Control Switch Lever, the
unit will stop the icemaking process automatically. The Display will change to the "bin
IMPORTANT
IMPORTANT
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Im-45mLm-250mIm-65mLm-350m

Table of Contents