Installation Procedure For Remote Site - NEC NEAX2000 IVS User Manual

Remote pim system
Table of Contents

Advertisement

START
Unpacking*
Marking and Drilling*
Installation of Main Equipment
Connection of Battery*
Switch Setting of DAIB Card
Mounting of DAIB Card
Switch Setting of DAIC Card
Mounting of DAIC Card
Switch Setting of
Line/Trunk Circuit Cards*
Mounting of
Line/Trunk Circuit Cards
Power Failure Transfer (PFT)
This manual describes only the installation procedure exclusively required for the Remote PIM
Note 1:
System. Refer to the Installation Procedure Manual for the procedures marked by * .
It is recommended that the Power Failure Transfer (PFT) is provided on the Remote Site in case
Note 2:
the link between the main site and the remote site is lost.
See Section 2.2.1
See Section 2.2.2
See Section 2.1.3
See Section 2.2.4
See Section 2.2.6
See Section 2.2.7
See Section 2.2.9
Note 2
Figure 3-4

Installation Procedure for Remote Site

ND-46550 (E)
Cable Running to MDF*
Termination of Cables on MDF*
Connection between
Main Site and Remote Site
MP Reset
System Initialization
and System Data Entry*
Operation Test*
Cleaning and Visual Check*
Mounting of Front Cover*
END