Summary of Contents for STIEBEL ELTRON SHO AC 600 7,5
Page 1
BEDIENUNG UND INSTALLATION OPERATION AND INSTALLATION UTILISATION ET INSTALLATION Geschlossener Standspeicher | Sealed unvented floorstanding cylinder | Chauffe-eau sur socle sous pression » SHO AC 600 7,5 » SHO AC 600 6/12 » SHO AC 1000 12 » SHO AC 1000 9/18...
CONTENTS | SPECIAL INFORMATION SPECIAL INFORMATION Specification ������������������������������������������������ 26 16.1 Dimensions and connections ��������������������������������� 26 OPERATION 16.2 Wiring diagrams and terminals ������������������������������ 27 General information ��������������������������������������� 18 16.3 Heat-up diagram ������������������������������������������������ 28 Safety instructions ���������������������������������������������� 18 16.4 Fault conditions ������������������������������������������������� 28 Other symbols in this documentation ����������������������...
OPERATION General information SPECIAL INFORMATION OPERATION - The appliance may be used by children aged 8 General information and up and persons with reduced physical, sen- sory or mental capabilities or a lack of experience The chapters "Special Information" and "Operation" are intended for both the user and qualified contractors.
OPERATION Safety Appliance description Other symbols in this documentation The appliance electrically heats domestic hot water, the temper- Note ature of which you can control with the temperature selector. General information is identified by the symbol shown Subject to the power supply, the water is automatically heated on the left.
OPERATION Settings Settings Signal anode with consumption indicator The temperature can be freely adjusted. Material losses If the consumption indicator changes colour from white to red, have the signal anode checked by a heating con- tractor and if necessary replaced. •...
INSTALLATION Safety INSTALLATION 10. Installation 10.1 Cold water connection and safety assembly Safety 10.1.1 Safety instructions Only a qualified contractor should carry out installation, commis- Note sioning, maintenance and repair of the appliance. Carry out all water connection and installation work in accordance with regulations.
INSTALLATION Installation 10.2 Signal anode 10.5 Thermometer Material losses When operating the cylinder without consumption indi- cator, leave the plug in the threaded hole. 1 Thermometer f Insert the thermometer as far as it will go and align it. 10.6 DHW connection and safety assembly 10.6.1 Safety instructions Note Carry out all water connection and installation work in...
INSTALLATION Commissioning 11. Commissioning 10.7 Power connection WARNING Electrocution 11.1 Commissioning Before any work on the appliance, disconnect all poles f Open a draw-off point until the appliance has filled up and from the power supply. the pipework is free of air. f Adjust the flow rate.
INSTALLATION Troubleshooting 14. Troubleshooting 15. Maintenance WARNING Electrocution Note Carry out all electrical connection and installation work The high limit safety cut-out can respond at temperatures in accordance with relevant regulations. below –15 °C. The appliance may be subjected to these temperatures during storage or transport.
INSTALLATION Maintenance 15.5 Replacing the heating elements and protective pipe f Install the electrically insulated heating element and protec- tive pipes into the flange plate. Material losses The corrosion protection resistor must not be damaged or removed during maintenance work. 3 heating elements 1 Protective pipes 2 Heating element...
INSTALLATION Specification 16. Specification 16.1.2 SHO AC 1000 16.1 Dimensions and connections 16.1.1 SHO AC 600 1100 1100 45° 45° SHO AC 600 7.5 SHO AC 600 6/12 SHO AC 1000 12 SHO AC 1000 9/18 Appliance Pitch circle diameter of feet mm b02 Entry electrical cables I Threaded fitting PG 16...
INSTALLATION Specification 16.2 Wiring diagrams and terminals 16.2.2 Dual circuit operation 3/N/PE ~ 400 V 6/12 kW, 12/12 kW, 9/18 kW, 18/18 kW 16.2.1 Single circuit operation 7.5 or 12 kW, 3/PE ~ 400 V 1 Heating element 2 Contactor 3 High limit safety cut-out 4 Temperature controller 1 Heating element...
Page 13
INSTALLATION Specification Connection example for dual circuit operation, version 2 Connection example for single circuit operation Connection example for single circuit operation with pow- er-OFF contact 1 Power-OFF contact, installed by the heating contractor 2 Pushbutton for controlling the rapid heat-up function re- motely, installed by the heating contractor With standard heating load and switch position II it is also possible to start the quick heat-up function during economy tariff times.
Specification 16.5 Details on energy consumption Product data complies with EU regulations relating to the Directive on the ecodesign of energy related products (ErP). SHO AC 600 7,5 SHO AC 600 6/12 SHO AC 1000 12 SHO AC 1000 9/18...
Need help?
Do you have a question about the SHO AC 600 7,5 and is the answer not in the manual?
Questions and answers