Show/Hide Bookmarks
4
4.1
L
Commissioning
First switch on
For commissioning, the system bus must be completely wired.
Stop!
Check the supply voltage before switching on the unit.
•
Check the wiring for completeness and short circuits,
•
Check whether the bus system is terminated physically at the first and last device.
Commissioning
EDBEPM-H315 DE/EN/FR 2.0
41