Download Print this page

Tools And Materials Required - Kohler Karess S-TRAP K-5331T-S Installation Instruction Manual

Vitreous china two-piece toilet

Advertisement

TOOLS AND MATERIALS REQUIRED

(Not supplied)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Supply pipe, at least 14" (356mm) long
·
Toilet supply shut-off valve, 10mm(3/8 ) recommended
NOTICE:
If the existing toilet does not have a supply shut-off
valve below the tank, install one before installing the new
toilet.
Reference Value
Finished Wall
Finished Wall
1207474-T01-A
"
12
730
C of Outlet
L
305
730
12
C of Outlet
L
400
Kohler reserves the right to change marked dimensions without prior notice.
·
254mm
·
305mm
·
·
·
·
·
·
·
·
·
K-5331T-S
730
475
140
394
350
1/2" Supply
805
1/2"
390
200
190
K-5471T-S
730
475
140
394
350
1/2" Supply
805
1/2"
390
200
190
-2-
14"(356mm)
10mm
370
276
Front of Bowl
586
242
370
276
Front of Bowl
586
242
Fig.#1
1
Unit: mm
:

Advertisement

loading

This manual is also suitable for:

Karess s-trap k-5471t-s