Tools And Materials Required - Kohler PORTRAIT LITE K-4217 Installation Manual

Vitreous china reverse trap toilet
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

S
10" adjustable wrench
S
12" pipe wrench
S
Metal file (file cut)
S
Tape measure
S
Tubing cutter
S
Level
S
Hacksaw
S
Putty knife
S
Screwdriver
S
Toilet gasket (wax seal)
S
Toilet T-bolts (2), 5/16" diameter
S
Toilet supply shut-off valve, 3/8" recommended
(If existing toilet does not have a shut-off valve below the
tank, install shut-off valve before installing new toilet. See
Page 3.)
ROUGHING-IN
29-3/8"
3/4"
3-3/4"
12"
BA
111469-2-
(-)
15"
C L OF OUTLET
20-7/16"
32-7/8"
9"
4-1/8"
Fig. #1
2
FRONT OF BOWL
16"
5-5/8"
10-3/16"
Kohler Co., Kohler, WI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portrait lite k-4590

Table of Contents