Installation - BOMANN EBK 962 Instruction Manual

Hide thumbs Also See for EBK 962:
Table of Contents

Advertisement

Delivery scope
Delivery scope
Delivery scope
Delivery scope
Installation material:
4x mounting bracket, 4x fixing
screw

Installation

Installation
Installation
Installation
WARNING:
WARNING:
WARNING:
WARNING:
The installation and the connection to the main power
may only be performed by an authorized specialist.
CAUTION
CAUTION
CAUTION
CAUTION: : : :
• The worktop, the cabinet, veneers, plastic coat-
ings, used adhesives etc. must be sufficient heat-
resistant.
• The appliance must be installed so that heat can
be dissipated. The ventilation openings (D) and
(E) must not be blocked.
• The distance between the hob and an extractor
hood must be at least as large as specified in the
instructions of the extractor hood!
• Below the cutout must remain a minimum dis-
tance. In this area are not allowed heat-sensitive
objects (cabinet, drawer, etc.). Possibly existing
sidewalls or drawer boxes must be sawed accord-
ingly or removed.
• Keep safety distances; sufficient air circulation
must be ensured:
Preparing the worktop for installation of the hob
Preparing the worktop for installation of the hob
Preparing the worktop for installation of the hob
Preparing the worktop for installation of the hob
CAUTION:
CAUTION:
CAUTION:
CAUTION:
Before cutting secure the outer cutout edge with wide
adhesive tape to avoid traces of jigsaw on the work-
top.
A A A A
760 mm
B B B B
50 mm
C C C C
20 mm
D D D D
Air intake
E E E E
Air outlet (5 mm)
• The worktop must have a thickness between
28 mm and 40 mm, it must be leveled horizontally
and are sealed to the wall side against overflow-
ing liquids or moisture.
• The hob must be completely surrounded by min.
50 mm work surface.
• The cut surfaces (cutout edges) must be sealed
with special varnish, silicone rubber or cast raisin
in order to prevent swelling caused by humidity.
Clean and dry the worktop in the cutout area
thoroughly.
Worktop cutout
Worktop cutout
Worktop cutout
Worktop cutout
Prepare the cutout of the worktop according to the
dimensional drawing.
Dimensions in mm
L L L L
W W W W
H H H H
580
510
55
S S S S Seal below the hob
Installing the hob
Installing the hob
Installing the hob
Installing the hob
• First check the factory fitted hob seal at the hob
frame to the integrity and the proper fit.
• Affix the brackets (1) to the provided drillings (2)
of the hob with the screws (3).
• Put the hob with the connecting cable first and
with the control panel to the front into the pre-
pared cutout.
6
D D D D
A A A A
B B B B
51
560
490
1 1 1 1
Bracket
2 2 2 2
Drilling
3 3 3 3
Screw
A A A A
Worktop
B B B B
Hob bottom
1 1 1 1
Bracket
3 3 3 3
Screw
X X X X
50

Advertisement

Table of Contents
loading

Table of Contents