NOTE: Please check contents and read directions carefully before assembly. If any items are missing
or damaged, do not take the product back to the store. Call Moon Valley customer service at
866.332.1616 and we will correct the problem as promptly and as efficiently as possible. Also,
checking or cracking of the logs is a natural part of the drying aspect of cedar. This does not affect the
structural integrity of the wood. This natural occurrence enhances the rustic beauty of the product.
Tools Required: Rubber Mallet or Hammer, ½" Socket & Socket Wrench, Square-Head
Screwdriver
M-1700 Rocker Assembly Instructions
Rocker Components
1. Insert doweled end of single-hole leg piece into double-hole leg piece.
Be sure that both remaining holes are facing the same direction (as
shown). Repeat process with remaining two leg pieces.
2. Attach leg assemblies to dowels on both sides of pre-assembled seat
(as shown). Use rubber mallet to ensure secure fit. If using a hammer,
be sure to pad impact area to prevent damage.
3. Insert doweled ends of pre-assembled seat back into the holes at the rear
of the seat assembly. If doweled ends do not line up, gently tap seat back
sidepieces in or out as needed. Tap top of seat back with rubber mallet or
hammer (with padding) to ensure secure fit (as shown).
(1) Pre-Assembled Seat Back
(1) Pre-Assembled Seat
(2) 9" Braces
(2) Rocker Runners
(4) Leg Pieces (2 single-hole, 2 double-hole)
(6) 3 3/8" Lag Bolts
(4) 2 ½" Square Head Screws
(10) 2" Square Head Screws
Assembly
Need help?
Do you have a question about the M-1700 Rocker and is the answer not in the manual?
Questions and answers