Installing updates and service packs
3.3 Checking plant status
3.3.3
Time synchronization
Before deactivating an OS server, you should check whether all computers in the PCS 7
plant are running in synchronism. System messages generated by the OS server are
assigned a time stamp by the OS server. If there is no time synchronization set for a
redundant OS server, for example, it is difficult to chronologically track the system
messages.
Note
You can find more information on time synchronization in manual "SIMATIC Process Control
System PCS 7 - Time Synchronization"
(https://support.industry.siemens.com/cs/ww/en/view/109746544).
3.3.4
Status of OS connections
The current status of all configured connections can be determined with the "Options >
Status - Connections" function in the WinCC Explorer.
Procedure
1. Open the WinCC Explorer on the OS server. The OS project must be in Runtime on the
server.
2. Select the menu command "Options > Status - Connections".
16
Compendium Part D - Operation and Maintenance (V9.0)
Operating Manual, 02/2018, A5E43228948-AA