Fusing Equipment
MN132021EN
200 A Fused Loadbreak Elbow Connector Replacement Fuse
Installation Instructions
Effective November 2016
Supersedes June 2011 (S240-97-1)
COOPER POWER
SERIES

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 200 A Fused Loadbreak Elbow Connector Replacement Fuse and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eaton 200 A Fused Loadbreak Elbow Connector Replacement Fuse

  • Page 1 COOPER POWER Fusing Equipment SERIES Effective November 2016 MN132021EN Supersedes June 2011 (S240-97-1) 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions...
  • Page 2: Disclaimer Of Warranties And Limitation Of Liability

    CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to...
  • Page 3: Table Of Contents

    Contents DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii SAFETY FOR LIFE .
  • Page 4: Safety For Life

    FOR LIFE FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety in its Cooper Power™ series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service.
  • Page 5: Product Information

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Product Information WARNING Capacitive Test Point Operating Instructions: Use only voltage indicating instruments specifically designed for Introduction test points . Use of conventional voltage sensing devices The 200 A, 15 and 25 kV Class Fused Loadbreak Elbow may provide false “No Voltage”...
  • Page 6: Fuse Replacement Procedures

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Fuse Replacement Procedures Step 1 Voltage Test Operation Complete current-limiting replacement fuse includes: The Fused Loadbreak Elbow Connector is equipped with two integral capacitive test points that can be used to Current-Limiting Fuse ●...
  • Page 7: Probe And Elbow Housing Disassembly

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Probe and Elbow Housing Disassembly Step 5 Detach drain-wire lead from the drain-wire eye of the Step 3 elbow housing. At the overlap of elbow housing and cable housing, insert supplied bleeder strap approx. 1/2" (13 After a visible ground is achieved on both sides of the mm) under lip of elbow housing.
  • Page 8: Fuse Disassembly

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Fuse Disassembly Step 7 Using the supplied 1/8" hex wrench, unthread the two set Step 6 screws from the probe adapter. Gripping the square portion of the cable housing, and keeping the cable housing stationary, apply a twist-and-pull motion to the elbow housing to separate it from the cable housing.
  • Page 9 200 A Fused Loadbreak Elbow Connector Replacement Fuse Step 8 Step 9 Remove probe adapter from fuse end cap stud on top of Gripping the square portion of the cable housing, use the fuse. supplied 3/16" hex wrench to loosen and unthread fuse from cable housing.
  • Page 10: Replacement Fuse Installation

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Replacement Fuse Installation Step 11 Thread fuse clockwise by hand and start threads into the Step 10 connector in bottom of the cable housing until hand-tight. Remove old fuse from cable housing.
  • Page 11: Probe Adapter Reassembly

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Probe Adapter Reassembly Step 13 Install probe adapter on unthreaded stud. Probe adapter Step 12 should rest flush on top of fuse end cap. Holding the square portion of the cable housing, complete fuse assembly using the supplied 3/16"...
  • Page 12: Elbow Housing And Probe Reassembly

    200 A Fused Loadbreak Elbow Connector Replacement Fuse Elbow Housing and Probe Reassembly Step 15 Using supplied lubricant, clean and lubricate elbow and Step 14 cable interfaces. Assemble elbow housing onto the cable housing. Make IMPORTANT sure the test point is facing outward away from the front plate of the apparatus.
  • Page 13 200 A Fused Loadbreak Elbow Connector Replacement Fuse Step 16 Clean and Push down and twist elbow housing to align the probe Lubricate Interface adapter. The threaded hole in the probe adapter should be centered with respect to the hole in the elbow housing and perpendicular to the probe axis.
  • Page 14 200 A Fused Loadbreak Elbow Connector Replacement Fuse Step 20 Loadbreak Operation Area must be clear of obstructions or contaminants that Operating Procedures ● ● would interfere with this operation. Loadmake Operation Use clampstick to secure standoff insulator or portable ●...
  • Page 15 200 A Fused Loadbreak Elbow Connector Replacement Fuse his page is intentionally left blank. InstallatIon InstructIons MN132021EN November 2016...
  • Page 16 2300 Badger Drive Waukesha, WI 53188 United States Eaton.com/cooperpowerseries © 2016 Eaton All Rights Reserved Eaton is a registered trademark. For Eaton‘s Cooper Power series product Printed in USA information Publication No. MN132021EN call 1-877-277-4636 or visit: All trademarks are property www.eaton.com/cooperpowerseries.

This manual is also suitable for:

Cooper power series

Table of Contents