3
Operation
3.1
Electrical Connection
Warning
Risk of suffering injury!
During all connection work deenergise mains power lines
(lockout/tag out). The electrical connections must only be
prepared by a trained electrician as, for example, in accordance
with EN 50110-1.
The mains connection of the pump system can be found on the right at the
bottom on the rear of the pump system. There also the main switch can be
found. The main fuse is located behind a cover panel on the main switch.
Connection
for the high
vacuum
gauge
Fuses for the
turbomolecular pump,
forepump and control
unit
Main switch
Mains connection