m
the "FLASH" output has poles: if the lights fail to
switch on according to the settings, the cables con-
nected to the terminal must be inverted.
50
position and lock the connector inside the slot on the boom
9.
51
10.
insert the boom and lock it with its cover, by vigorously
tightening the 4 screws and being careful not to pinch the
cable.
52
9.5 CONNECTING THE WARNING LIGHT OR
TRAFFIC LIGHT
On the boom cover it is possible to insert a LED warning light
model XBA7 or a traffic light with red and green LEDs model
XBA8.
The operating modes of these warning lights can be modified
through the Oview programmer or by suitably programming the
control unit.
For further information, consult the instruction manuals of the
two products
9.6 CONNECTING AND INSTALLING THE BACK-
UP BATTERY
f
The electrical connection of the battery to the con-
trol unit must be made only after completing all the
installation and programming stages, as the battery
is an emergency power supply.
f
Before installing a back-up battery, disconnect the
power supply to the control unit.
To install and connect the battery:
position the back-up battery (A)
1.
2.
connect the appropriate cable (B) to the back-up battery
connector
53
3.
remove the membrane (C) present on the control unit
connect the appropriate cable (B) to the control unit con-
4.
nector (D)
54
C
activate the mains power supply.
5.
B
A
B
D