Casing Assembly - Hamworthy LILIPUT HE Installation, Commisioning And Maintenance Instructions

Gas/oil fired cast iron sectional boilers
Table of Contents

Advertisement

7.

CASING ASSEMBLY

The boiler casing kit consists of:
Side panel RH
Side panel LH
Top cover
Front cover with insulation
Rear plate RH
Rear plate LH
Boiler sections insulation jacket
Rear insulation jacket
Bag containing:-
4 bolts M10x15
15 screws 4x10
4 spacers 80mm long
1.5m of duct tape
B
B
Fig. 3. Bolier Casing Assembly
HAMWORTHY HEATING LTD
Remove the 4 locknuts
from the tie rods at po-
sition A.
A
Loosen the 4 locknuts
at position B and back
off the nut to the end of
the stud
A
Wrap the insulation
jacket around the
boiler sections. Check
that the cut outs (A)
are positioned around
A
the rear spacers and
secure in position with
duct tape.
LILLIPUT HE
A
A
11
Screw the four 80mm
spacers on to the
ends of the tie rods
A
and partly screw in
the four M10x15 bolts
into the ends of the
spacers.
A
Fit the rear insulation
jacket over the flue
outlet. Secure the top
and side edges of the
rear jacket to the wrap
using duct tape
500001047/F