Transport, storage and packing
Fig. 20
Preparing for lifting out
Transporting to the instal-
lation site
14
CAUTION
Crushing hazard
Hands may get crushed when lifting out the vacuum circuit-breaker.
Do not reach between the transport box and the vacuum circuit-breaker.
•
Hook crane hooks into the transport screws and into the openings on the mech-
anism box.
•
Observe crane hook symbols.
•
Vertically lift out vacuum circuit-breaker.
•
Transport to installation site or leave suspended from crane for further work
steps.
Note
Keep partitions and accessory pack ready for the installation.
Fig. 21
Lifting out
9229 9860 176 0E
2013-08-22