3.3 Installation of Cable connection kit
Note !
20222683 / A
Step 3 - Install Spent Cable Tube
1. Install spent cable tube in exit port.
2. Install 2 x lock bolt, nut and washers into
ports. Tighten and torque to 40-45 in-lbs
(4 Nm).
For best performance the following dimensions should be
followed.
786 mm MIN
640 mm
105 mm
R150 MIN
STEERING CABLE
It is desirable that the cable connector kit is perpendicular to
the Tiller arm or quadrant at mid stoke. This geometry will
give the optimum performance.
932 mm
105 mm
UNIVERSAL CONNECTION KIT
Installation
RUDDER
RUDDER POST
254 mm MAX
9