Cable Run - Simrad Maris ECDIS900 Installation Manual

Hide thumbs Also See for Maris ECDIS900:
Table of Contents

Advertisement

MARIS ECDIS900 Installation Manual
C
ABLE RUN
Plan the installation and lay up the cables. Use existing cable ways and transitions as much
as possible. New transitions must be made in accordance with good workmanship and they
must be properly sealed (for fire protection).
Yes, accepted by class
From hall of fame
All cables in the installation kit are screened cables. Do not forget to make a proper
grounding of the cables and the computers. The ToughCat network cable is perfect for
connecting the sensors and has 4 individually screened pairs.
The RJ45 network plugs supplied will ground the cable when fitted.
In addition to the mandatory sensors, lay-up the cables for other sensors. It is common practice
to connect AIS, ARPA X, Navtex, Echo sounder and Anemometer to the monitoring station
and other sensors to the planning stations. Because these sensors are not mandatory, the data
can be distributed over the network to all computers.
No, rejected by class
From hall of shame
Page 23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents