To install the VEP4600, complete the installation procedures in the order presented in this section.
Always handle the platform and components with care. Avoid dropping the platform or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the VEP4600 and components. As with all electrical devices of this type, take all the necessary safety precautions to
prevent injury when installing this platform.
Topics:
•
Unpack
•
Ground lug
•
Rack or cabinet hardware installation
•
Two-post installation
•
Four-post installation
•
Optics installation
•
Platform power-up
Unpack
Unpack the platform carefully.
NOTE:
Before unpacking the platform, inspect the container and immediately report any evidence of damage.
When unpacking the platform, make sure that the following items are included:
•
One VEP4600
•
One RJ-45 to DB-9 female cable
•
Two-post rail kit; no tools required
•
One or two country- or region-specific AC power cords, depending on the configuration
•
VEP4600 Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the platform from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
Ground lug
Dell EMC recommends you ground your switch; however, grounding is optional and the ground lug assembly kit is not included with the
switch. The ground lug must be a UL-recognized, crimp-type lug. To order a UL-certified ground lug with bracket, contact your Dell EMC
sales representative.
NOTE:
The ground cable is not included with the switch.
16
VEP4600 installation
VEP4600 installation
4