Dismantling - Siemens 1PH728 Operating Instructions Manual

Three-phase induction motor ac compact drives
Table of Contents

Advertisement

Maintenance
7.3 Corrective Maintenance
See also
Transport, storage (Page 23)
Observing the five safety rules (Page 7)
7.3.2

Dismantling

Disassembly instructions
The drawings and parts lists do not contain any detailed information about the type and
dimensions of retaining elements and the like.
NOTICE
Before you start dismantling them, you should therefore mark up the respective assignment
of retaining elements and the layout of the internal connections for assembly if they have to
be disconnected for maintenance work.
NOTICE
Use pullers or suitable devices to disassemble parts and components attached to the motor
shaft.
Three-phase motors of a vertical construction type can be dismantled in the horizontal
position.
Working with three-phase motor in vertical position
NOTICE
When working on the locating bearing when the three-phase motor is in its vertical position,
support the rotor.
When attaching the rotor in a vertical position, make sure that the centering recesses in the
shaft ends (DIN 332) - DS M24 have a recessed thread; DIN 580 eye-bolts are unsuitable
because only a few threads would be engaged.
Table 7-3
1PH7 28. rotor
Size
Total weight (kg)
Disassembling the three-phase motor
To disassemble the motor, disconnect the connecting cables from the terminals and the
entry plate from the terminal box housing.
58
The rotor weights for the 1PH7 three-phase motor can be found in the following table:
284
343
286
410
Siemens AG Operating Instructions 2.02 1PH728
288
489
A5E00177602A AD

Advertisement

Table of Contents
loading

Table of Contents