Control elements and interfaces
(1) The display is always off as standard (sleep mode).
(7) Attachment holes for external optical modules and external cables
(8) User protection and slots for external cable connections
Fitting the screw-type meter
• Dismantle the fl ushing tube or existing meter
• Remove old seals
• Dismantle temperature sensor if appropriate
• Remove threaded protective caps
Always use new seals
when installing a new meter!
• Tighten screw fi tting with new seal to max.
45 Nm tightening torque
V2.0 / 21.12.17
Press the < H > or < V > key
briefl y to open the fast readout
display loop.
Press the < H > or < V > key
longer than 3 seconds to open
the level operating scheme.
(2) <H> key (horizontal)
(3) <V> key (vertical)
(4) IrDA interface
(5) Interface cover
(6) Module interface
MU2H-0491ge23 R1217
29
EN