Opening The Unit; Accessories - Daikin VRV W T-Series Installation Manual

Water-cooled system air conditioner
Hide thumbs Also See for VRV W T-Series:
Table of Contents

Advertisement

▪ Lift the unit preferably with a crane and 2 belts of at least 16.41 ft
(5 m) long as shown in the figure below. Always use protectors to
prevent belt damage and pay attention to the position of the unit's
center of gravity.
b
d
a
c
a
Packaging material
b
Belt sling
c
Opening
d
Protector
NOTE
Use a belt sling of ≤0.79 inch (20 mm) wide that
adequately bears the weight of the unit.
▪ A forklift can only be used for transport as long as the unit remains
on its pallet as shown above.
2 .2

Opening the unit

Relief the unit from its packing material:
▪ Take care not to damage the unit when removing the shrink foil
with a cutter.
▪ Remove the 4 bolts fixing the unit to its pallet.
WARNING
Tear apart and throw away plastic packaging bags so that
nobody, especially children, can play with them. Possible
risk: suffocation.
1
2
3
RWEQ96~432TAYCU
VRV W T-Series water-cooled system air conditioner
4P540122-1B – 2018.11
d
2 Inspection, handling and unpacking the unit
2 .3

Accessories

Make sure that all accessories are available in the unit.
a
b
f
g
a
Operation manual
b
Installation manual
c
Additional refrigerant charge label
d
Vinyl tube
e
Conduit mounting plate
f
Piping accessory bag
g
Hose
h
Strainer (50 mesh, ANSI-ASME B1.20.1•1-1/4-11.5NPT
female thread, only for water use)
i
Pipe adaptor (ISO228-1•G1-1/4B→ANSI-ASME B1.20.1•
1-1/4-11.5NPT)
Accessories: Diameters
Accessory pipes
MBH
Liquid pipe
96
▪ Front connection
(a)
120
Øa
Øb
144
▪ Top connection
Øc
Ød
4
c
d
e
h
i
Unit: inch (mm)
Øa
Øb
Øc
Ød
1/2
1/2
1/2
3/8
(12.7)
(12.7)
(12.7)
(9.5)
1/2
(12.7)
Installation manual
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents