To Connect The Pc Configurator To The Outside Unit; Commissioning; Overview: Commissioning; Precautions When Commissioning - Daikin VRV W T-Series Installation Manual

Water-cooled system air conditioner
Hide thumbs Also See for VRV W T-Series:
Table of Contents

Advertisement

Error code (Auto
backup possible)
H9
Outside unit inside air thermistor (R1T) abnormality
HC
Water inlet thermistor (R9T) abnormality
Water outlet thermistor (R10T) abnormality
J3
Discharge pipe thermistor (R12T) abnormality
Compressor body thermistor (R13T) abnormality
J4
Plate heat exchanger gas thermistor (R4T)
abnormality
J5
Suction pipe thermistor (R3T) abnormality
J6
Plate heat exchanger liquid thermistor (R7T)
abnormality
J7
Receiver outlet liquid pipe thermistor (R6T)
abnormality
Subcooling heat exchanger outlet liquid pipe
thermistor (R8T) abnormality
Injection pipe thermistor (R11T) abnormality
J9
Subcooling heat exchanger outlet gas pipe
thermistor (R5T) abnormality
Exhaust heat cancellation heat exchanger gas
pipe thermistor (R2T) abnormality
JA
High pressure sensor abnormality
JC
Low pressure sensor abnormality
L1
Inverter PCB abnormality
L3
Reactor temperature rise abnormality
L4
Inverter radiation fin temperature rise abnormality
L5
Inverter compressor instantaneous overcurrent
L8
Inverter compressor overcurrent
L9
Inverter compressor startup abnormality
LC
Transmission error between inverter PCB and
outside unit main PCB
7 .2 .9
To connect the PC configurator to the
outside unit
2
3
4
5
a
PC
b
Cable (999482P3)
c
Outside unit main PCB
RWEQ96~432TAYCU
VRV W T-Series water-cooled system air conditioner
4P540122-1B – 2018.11
Error contents
a
c
b
X27A
A1P
8

Commissioning

8 .1

Overview: Commissioning

After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run must be
performed according to the procedures described below.
This chapter describes what you have to do and know to
commission the system after it is configured.
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run.
3
If necessary, correcting errors after abnormal completion of the
test run.
4
Operating the system.
8 .2

Precautions when commissioning

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
CAUTION
Do not perform the test operation while working on the
indoor units .
When performing the test operation, not only the outside
unit, but the connected indoor unit will operate as well.
Working on an indoor unit while performing a test operation
is dangerous.
CAUTION
Do not insert fingers, rods or other objects into the air inlet
or outlet. Do not remove the fan guard. When the fan is
rotating at high speed, it will cause injury.
INFORMATION
During the first running period of the unit, the required
power may be higher than stated on the nameplate of the
unit. This phenomenon is caused by the compressor, that
needs a continuous run time of 50 hours before reaching
smooth operation and stable power consumption.
NOTE
Be sure to turn on the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.
During test operation, the outside unit and the indoor units will start
up. Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation manual
of the indoor units for details.
8 .3

Checklist before commissioning

After the installation of the unit, first check the following items. Once
all below checks are fulfilled, the unit must be closed, only then can
the unit be powered up.
You read the complete installation and operation
instructions, as described in the installation manual.
Installation
Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.