5 Installation
5 .8 .4

To route and fix the transmission wiring

Transmission wiring can be routed through the front side only. Fix it
to the upper mounting hole.
A
Fix to the indicated plastic brackets (factory installed).
5 .8 .5

To connect the transmission wiring

The wiring from the indoor units must be connected to the F1/F2
(In-Out) terminals on the PCB in the outside unit.
Tightening torque for the transmission wiring terminal screws:
Screw size
M3.5 (A1P)
In case of heat recovery mode
TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT
d
F1
F2
F1
F2 Q1Q2
a
b
A1P
A1P
F
F
F
F
Q
Q
Q
Q
1
2
1
2
1
2
1
2
e
e
g
a
Unit A (main outside unit)
b
Unit B (sub outside unit)
c
Unit C (sub outside unit)
d
Outside unit PCB (A1P)
e
Main/sub transmission (Q1/Q2)
f
Outside/indoor transmission (F1/F2)
g
Outside unit/other system transmission (F1/F2)
h
Branch selector unit
i
Indoor unit
j
Cooling-only VRV indoor unit
Installation manual
32
A
TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT
F1
F2
F1
F2 Q1 Q2
A1P
Tightening torque
0.59~0.71 ft·lbf (0.8~0.97 N·m)
f
F1 F2 F1 F2
F1 F2 F1 F2
TO IN/D
TO OUT/D
TO IN/D
TO OUT/D
UNIT
UNIT
UNIT
UNIT
h
h
c
A1P
Q
Q
1
2
F1 F2
F1 F2
F1 F2
F1 F2
i
i
j
F1 F2
F1 F2
In case of heat pump mode
b
c
d
A1P
F1 F2 F1 F2 Q1 Q2
Q1 Q2
Q1 Q2
e
f
f
e
F1 F2
F1 F2
h
i
F1 F2
F1 F2
a
Outside unit PCB (A1P)
b
Unit A (main outside unit)
c
Unit B (sub outside unit)
d
Unit C (sub outside unit)
e
Outside unit/other system transmission (F1/F2)
f
Outside-outside unit transmission (Q1/Q2)
g
Indoor unit
h
Use the conductor of sheathed wire (2 wire) (no polarity)
i
Terminal board (field supply)
▪ The interconnecting wiring between the outside units in the same
piping system must be connected to the Q1/Q2 (Out Multi)
terminals. Connecting the wires to the F1/F2 terminals results in
system malfunction.
▪ The wiring for the other systems must be connected to the F1/F2
(Out-Out) terminals of the PCB in the outside unit to which the
interconnecting wiring for the indoor units is connected.
▪ The base unit is the outside unit to which the interconnecting
wiring for the indoor units is connected.
5 .8 .6

To finish the transmission wiring

After installing the transmission wires inside the unit, wrap them
along with the on-site refrigerant pipes using finishing tape, as
shown in figure below.
c
f
b
d
f
a
e
f
a
Liquid pipe
b
Gas pipe
c
Finishing tape
d
High pressure/low pressure gas pipe
e
Transmission wiring (F1/F2)
f
Insulator
5 .8 .7

To route and fix the power supply

NOTE
When routing ground wires, secure clearance of 1 inch
(25.4 mm) or more away from compressor lead wires.
Failure to observe this instruction properly may adversely
affect correct operation of other units connected to the
same ground.
VRV W T-Series water-cooled system air conditioner
F1
F2
F1
F2 Q1 Q2
TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT
g
a
F1 F2
F1 F2
RWEQ96~432TAYCU
4P540122-1B – 2018.11