Download Print this page

Cal-Royal M SERIES Installation Manual page 2

Heavy duty mortise lock

Advertisement

Door Preparation
1. Align door preparation template on
edge of door with applicable lines.
Check door preparation chart and
mark only holes for lock function
being installed.
2. Mortise door edge according to
measurements of installation
template and drill proper holes for
trims.
Strike preparation
1. Align strike template on jamb
according to measurements of strike
installation template.
Bore 1" diameter holes into door
edge, 1 1/8" deep. Recess 5/32" for fit
of strike and box.
2. Mortise jamb according to measurement
of installation template. Then fit strik
and dust box into frame and secure into
place with screws.
M SERIES
Heavy Duty Mortise Lock
Installation
Template
C L
of Cylinder
Lockcase Installation
C L
of Front
Plate
1. Insert lockcase into
C L
of Lever
Vertical Line
of Lever
Installation
Template
1-1/8"
Depth
C L of Front
Plate
3 -3/4"
Height
Outside lever
1. Place spring cage onto outside lever
2. Position outside lever assembly into
C L of Front
Plate
mortise cut-out & fasten
screws to door.
assembly with arrows pointing in
direction of lever rotation. Insert
spindle into hub of lock case.
post holes of lock case.

Advertisement

loading