Checking The Timing; Installing The Valve Clearance - PEUGEOT XS1P52QMI-4 Workshop Manual

125/151 cc 4-stroke engine 2 valves sym
Table of Contents

Advertisement

CYLINDER HEAD/CYLINDER/PISTON
- Fit the chain tensioner gasket.
- Install the chain tensioner and the
2 attachment screws (1).
Tightening torque: 10 Nm.
- Using a flat blade screwdriver, unlock the
chain tensioner screw.
- Fit the O-ring.
- Install the tensioner cap.
Tightening torque: 8 Nm.

Checking the timing

- Rotate the engine twice: 2 revolutions in the
engine's operating direction.
- Turn the magnetic wheel to line up the "T"
mark with the the crankcase boss (A).
- Make sure the camshaft marks (B) are parallel
with the gasket seat surface.
- If the marks are not alined, reset the valve
timing.

Installing the valve clearance

- Remove the rocker cover.
Tightening torque: 8 Nm.
- Using a wrench, turn the crankshaft in the
direction of operation to as to line up the
marks on the camshaft gear (B) with the
cylinder head gasket face.
40
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
1
A
B
.
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xs1p57qmj-2

Table of Contents