ROA 128 5151
PIM Evaluation Board
4
4.1
Power-up and Power-down Instructions
Power-up instruction
PIM 4328:
•
Mount the PIM products in the position (see 9b, Figure 1).
•
Make sure the enable switches are in OFF position (see 7, Figure 1).
•
Connect and turn On the 36-75 V supply.
•
Turn either enable switch A or B in ON position.
•
Connect the PMBus Adapter/Cable to the board.
•
Start the 3E GUI Gold Edition software.
PIM 4820:
•
Mount the PIM products in the position (see 9a, Figure 1).
•
Connect and turn On the 36-75 V supply.
•
Connect the PMBus Adapter/Cable to the board.
•
Start the 3E GUI Gold Edition software.
User Guide
1/28701-ROA 128 5151 Rev A
© Flex
9
May 2018