Disassembly Procedure - Mitsubishi Electric Series PDFY Technical & Service Manual

Ceiling concealed built-in
Table of Contents

Advertisement

8

DISASSEMBLY PROCEDURE

8-1 CONTROL BOX
OPERATING PROCEDURE
1.Removing the control box cover
(1)Remove the fixing screws(two) of the cover(A) and
remove the cover.
2.Removing the control box and cover
(1)Remove the fixing screw and earth screw.
(2)Slide the control box in direction of the arrow 1.
(3)Remove the connecter on the P.W.B.
(4)Remove the fixing screws(two) of the cover(B) and
remove the cover.
Be careful removing heavy parts.
PHOTOS
(A)
Fig.1
1
Fig.2
(B)
Fig.3
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents