Siemens RUGGEDCOM WIN7025 Installation Manual page 31

Hide thumbs Also See for RUGGEDCOM WIN7025:
Table of Contents

Advertisement

RUGGEDCOM WIN7025
Installation Guide
Figure 14: +48 V Wiring Configuration
1. Ground Wire (Connects to Connector Chassis)    2. -48 V    3. + 48 V (Hot)    4. Connector    5. 48 V Battery/Power Supply
Figure 15: -48 V Wiring Configuration
1. 48 V Battery/Power Supply    2. -48 V (Hot)    3. + 48 V    4. Ground Wire (Connects to Connector Chassis)    5. Connector
3.
Connect a fiber optic Ethernet cable between the F/O port on the base station and a 1000Base-LX fiber optic
port on a switch or router.
Connecting an SFD Type Base Station
1
2
3
-
+
2
3
-
+
1
5
4
Installing the Base Station
4
5
Chapter 2
23

Advertisement

Table of Contents
loading

Table of Contents