Siemens RUGGEDCOM WIN7025 Installation Manual page 27

Hide thumbs Also See for RUGGEDCOM WIN7025:
Table of Contents

Advertisement

RUGGEDCOM WIN7025
Installation Guide
1
7
Figure 10: Typical Centralized DC Power System, Plant and Distribution DC Power System Grounded at the Equipment
Location
1. Charge Bus    2. Batteries    3. Discharge Bus    4. Primary Distribution    5. Secondary Distribution    6. DC Powered Equipment    7. Charge/
Rectifier    8. Battery Bank #1    9. Battery Bank #2    10. Primary Powerboard    11. Secondary Powerboard    12. Equipment Grounding
Conductor    13. Main Bonding Jumper    14. Grounding Terminal Bar or Bus    15. Grounding Electrode Conductor    16. Grounding Electrode
DANGER!
Electrocution hazard – risk of death or serious injury. The system must be properly grounded to protect
against power surges and accumulated static electricity. It is the installer's responsibility to install this
base station in accordance with the local electrical codes.
To ground the base station, do the following:
1.
Assemble the ground connection as shown:
Grounding the Base Station
2
3
8
9
4
5
10
11
12
13
14
15
Chapter 2
Installing the Base Station
6
13
16
19