Charger/Controller Unit Installation (continued)
Step 2 – Electrical Connections
s
!
W A R N I N G
Disconnect power from all electrical equipment housed within the sump system before working on or around the sump pump
or battery backup system beginning with the 115 VAC powered pump, level switches, and charger controllers; followed by DC
powered items. Includes all items such as pumps, level control switches, charger/controller unit, and battery system.
s
NOTICE
!
Installation of the 115 VAC electrical supply circuit to the battery charger is to be done by a certified licensed electrician in accordance
with national and local codes.
a. Verify that charger/controller unit is NOT connected to the power supply source.
b. Verify that all plumbing is complete per instructions.
c. Connect the terminals from the control switch cord to the (2) male tab terminals on the junction box marked "FLOAT SWITCH CONNECTION".
d. Connect the terminals from the backup pump cord to the (2) male tab terminals on the junction box marked "PUMP FUSE & CONNECTION", being
careful to match the correct polarity. Correct polarity is marked on the pump cord ("POS" is positive) as well as the junction box ("+" is positive;
"-" is negative).
e. Connect charger/controller unit to the (2) male tab terminals on the junction box marked "CHARGER CONNECTION" being careful to match the correct
polarity. Correct polarity is marked on the cord (red terminal is positive; black terminal is negative) as well as the junction box ("+" is positive;
"-" is negative).
f. Check polarity of battery posts. Positive (POS, P, +) battery post usually has a larger diameter than the negative (NEG, N, -) battery post. Some
batteries are equipped with wing-nut terminals allowing for easy attachment of the jumper wires to these posts.
g. Attach the ring terminal of the black jumper wire to the negative battery post. Attach the quick connect terminal of the black jumper wire to the
negative ("-") male tab on the junction box marked "BATTERY CONNECTION".
h. Attach the ring terminal of the red jumper wire to the positive battery post. Attach the quick connect terminal of the red jumper wire to the positive
("+") male tab on the junction box marked "BATTERY CONNECTION".
i. Do not connect this charger/controller unit to the same circuit as is used for the primary pump. The AC outlet used for the charger/controller unit
requires separate 0.2A, 115 VAC circuit.
j. Verify that all wiring is per instructions. Once all plumbing and electrical connections are complete and verified, plug the charger/controller unit into
a 115 VAC electrical outlet.
k. Review Charger/Controller Operation section.
l. Perform testing per the Sump System Operation Testing section.
BATTERY CONNECTION
CHARGER CONNECTION
FLOAT SWITCH CONNECTION
REPLACE FUSE WITH SAME 20 AMP 38V TYPE
AND RATING ONLY
PUMP FUSE &
CONNECTION
DISABLE ENABLE
AUDIBLE ALARM
DISABLE WHEN LIT
10
Junction Box
WARNING
Comply with all national and local electrical and plumbing codes when installing this unit.
MICRO PROCESSOR
CONTROLLED
5 STAGE
BATTERY CHARGER/
MAINTAINER
WHEN YELLOW - GREEN FLASHING ALTERNATELY
REFER TO ERROR TABLE IN MANUAL
Charger Unit
Red Jumper Wire
(Positive)
Charger Positive Lead
Pump Positive Lead
Backup Pump Control Switch
Wiring Diagram
12 VDC Deep
Cycle Battery
Black Jumper Wire
(Negative)
Pump Cord
Charger Negative Lead
Pump Fuse
Pump Negative Lead
12 VDC Backup Pump