Download Print this page
Phytec phyBOARD-Mira i.MX 6 HTML-Kit Quick Start Manual

Phytec phyBOARD-Mira i.MX 6 HTML-Kit Quick Start Manual

Hide thumbs Also See for phyBOARD-Mira i.MX 6 HTML-Kit:

Advertisement

Quick Links

-Mira i.MX 6 HTML-Kit
phyBOARD
®
Get your phyBOARD
-Mira powered up and connected in just a few simple steps.
®
1) Preparing the Hardware
1. Check the kit content (see overview on the right hand side).
2. Have your connection cables at hand: You need a power supply and optionally a standard
Ethernet cable. Phytec offers an accessory kit which includes these cables.
3. Power up the phyBOARD-Mira.
For the 24 V-kit version (A):
connector (included) to a 12 V-24 V ( ± 10%) DC power supply.
Please note the polarity of the connectors, see picture (A)!
If you have bought the optional power supply with your kit, it comes already with the 2-pin connector wired.
4. Turn your power supply on and plug the 2-pin PHOENIX connector into the green jack of your kit.
The Power LED D2 will light up.
phyBOARD
Germany
France
PHYTEC Messtechnik GmbH
PHYTEC France SARL
D-55129 Mainz
F-72140 Sillé le Guillaume
Tel.: +49 6131 9221-0
Phone:+33 2 43 29 22 33
Fax: +49 6131 9221-33
Fax: +33 2 43 29 22 34
www.phytec.de
www.phytec.fr
www.phytec.eu
USA
India
PHYTEC America LLC
PHYTEC Embedded Pvt. Ltd.
Bainbridge Island, WA 98110
Kormangala, Bangalore
Phone: +1 206 780-9047
560095 Karnataka
Fax: +1 206 780-9135
Phone: +91 8041307589
www.phytec.com
www.phytec.in
Connect the 2-pin PHOENIX
12V-24V-kit version
A
+
GND
-Mira i.MX 6
®
China
PHYTEC Information Technology Co. Ltd.
Anlian Plaza, 4018 Jin Tian Road
Futian District, Shenzhen
518026 P.R. China
www.phytec.cn
Kit Contents — phyBOARD-Mira i.MX 6 (PB-01501-005) includes:
Evaluation
Module
(PEB-EVAL-01)
Carrier Board
(PB-01501-1201I)
Additional Equipment required
Power Adapter 5 V or 24 V
Carrier Board
(PB-01501-1201I
Quick
Start
Guide
2-pin PHOENIX
CAN and RS232 Adapter
Power Module 12 V-24 V
(PEB-POW-01)
7" Display with
capacitive Touch
Ethernet Cable

Advertisement

loading
Need help?

Need help?

Do you have a question about the phyBOARD-Mira i.MX 6 HTML-Kit and is the answer not in the manual?

Questions and answers

Summary of Contents for Phytec phyBOARD-Mira i.MX 6 HTML-Kit

  • Page 1 2. Have your connection cables at hand: You need a power supply and optionally a standard Module Power Module 12 V-24 V Ethernet cable. Phytec offers an accessory kit which includes these cables. (PEB-EVAL-01) (PEB-POW-01) 3. Power up the phyBOARD-Mira.
  • Page 2 /Applications/Utilities, as shown in (H). The first Terminal will be used to upload a custom index.html. Navigate to the folder where the new index.html is situated using cd. Enter sftp root@192.168.3.11:/srv/nodejs/apps/phytec-html5-demo/www/ . Accept the ssh certificate as trusted by typing yes. Type put index.html to upload the new file and overwrite the pre-deployed file.