Before Installation - Eau de Vie EDV-TT-BP Installation And Operation Handbook

Table of Contents

Advertisement

BEFORE INSTALLATION

This water cooler has been designed to supply the highest quality of water. In order to
get the best performance from your product, we advise you to carefully read the
instructions contained in this manual and keep it for future reference.
UNPACKING
1.
Remove the two plastic straps.
2.
Lift the internal cardboard box up
and out of the cage. Carefully
check that the water cooler has
not been damaged during
transport. Any signs of damage
must be reported to the
forwarder immediately.
3.
If the water cooler has been
transported in a horizontal or
inclined position, the machine
must not be turned on for 8 hours
(to let the refrigeration circuit
work perfectly) .
4.
A qualified technician must be
used to connect to the electric
supply, following the
manufacturer's instructions and
according to the local safety
regulations.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents