INSTALLATION
Img. 14.1
FILLING THE ICE-BANK
Access via the back of the machine.
Pour drinking water into the tank using
the 3/8 bulkhead filling (fig 14.1).
Stop filling the ice bank when the max
level 2 (Img 14.2) has been reached.
If water exceed this level, water in excess
will flow out on the frontal drip-tray.
Once the ice-bank is full, avoid moving the
machine. If it needs to be moved,
remember to empty the ice-bank first.
CONNECTION TO MAINS WATER
Img. 14.2—Ice Bank water level - MAX
Check that the mains water supply has a
pressure of between 1 and 3 bar.
NOTE: IF THE INLET WATER PRESSURE IS
HIGHER THAN 3,00 Bar, A PRESSURE
REDUCER MUST BE INSTALLED
Use a tube of food grade by 3/8" (9.50
mm outside diameter) to connect the
power input of the water for the water
supply network, preferably with a tap at
the wall. Connect in the same manner as
the gas pipe (always 3/8").