Installing The Thread Stand; In The Case The Machine Is Transported After Factory-Completed At The Time Of Shipment - JUKI LK-1900S Series Instruction Manual

Hide thumbs Also See for LK-1900S Series:
Table of Contents

Advertisement

3-15. Installing the thread stand

3-16. In the case the machine is transported after factory-completed at the time
of shipment
Pass bed fixing bolt ❸ , plain washer ❹ and nut ❺ through hole ❶ in the table and hole ❷ in the sewing
machine bed to fix the bed on the table.
1) Assemble the thread stand unit, and insert it in
the hole in the machine table.
2) Tighten locknut ❶ to fix the thread stand.
3) For ceiling wiring, pass the power cord through
spool rest rod ❷ .
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents